Back

CUBE

CUBE is a stacked workshop building of 4,734 square metres for the Faculty of Engineering Technology on the Drienerlo campus of the University of Twente in Enschede. It forms a compact extension of the existing Horst complex and was designed by Civic Architects together with VDNDP and Studio Groen+Schild. Visitors enter above a seven-metre-high metal and welding workshop whose floor is sunk 1.4 metres below ground level, giving a clear overview of the machines and showing what the faculty stands for.

The building contains five workshops for welding, metalworking, model building and assembly, plus around 500 square metres of laboratory and measuring spaces. These are stacked rather than placed side by side to keep the footprint compact, the circulation short and the visual contact between spaces optimal. Offices lie along the south side, the logistics entrance with truck access is on the north, and circulation and service cores form a backbone along the east edge. A pyramid-shaped atrium brings daylight deep into the building and links the floors. The project ran from 2020 to 2025 for the University of Twente.

CUBE 02 Stijn Bollaert © Stijn Bollaert
CUBE 03 Stijn Bollaert © Stijn Bollaert
CUBE 04 Stijn Bollaert © Stijn Bollaert
CUBE 05 Stijn Bollaert © Stijn Bollaert

Building details

Location Enschede, Nederland
Year 2025
Typology University
Access type Free access