© Stijn Bollaert
The old library of Arnhem was a stern and closed building, standing on the fault line between the historic centre and the post-war city around it. A large-scale renovation, including specially developed glass panels, has given it a second life. Its openness and transparency let it work as a hinge between the two parts of the city.
A key move was to create spatial generosity by removing two mezzanine floors, adding a new floor and cleaning up the existing office floors. This makes Building 026 future-proof: it can accommodate a wide range of functions and later changes of use are easy. Design started in 2014 and the building was completed in 2016.
Arnhem lies on the river Rhine, and its centre was largely rebuilt after the Second World War. The old library stood at the border between the historic quarter and the post-war city and, for many years, it presented a closed face to both.
The renovation turns this introverted building into an open and transparent one. Its new glass elements let in daylight and allow passers-by to look inside, so that the building can again serve as a place where people meet.
© Ossip van Duivenbode
© Ossip van Duivenbode
© Ossip van Duivenbode
© Ossip van Duivenbode