© Stijn Bollaert
The building stands in a developing neighbourhood on the inner periphery of Nantes. The plot is wedged between a tree-lined boulevard to the south and, to the north, a disused rail line overlooked by a large wooded park. A position in the centre of the plot made it possible to create the largest, and therefore most profitable, floor area under the planning rules while keeping the required on-site parking.
The structure is steel, with posts that become slimmer on each storey. Balconies of metal grating run along the entire perimeter so people can step outside on every floor, and motorised exterior blinds with retractable, adjustable slats control light and heat. The 2,735 square metre building for SCI Cardiff was completed in 2002.
The building stands in a developing neighbourhood on the inner edge of Nantes. The plot lies between a tree-lined boulevard to the south and a disused railway line to the north, overlooked by a large wooded park.
The architects used this unusual position to create offices with generous daylight and open views, built economically in the spirit of the practice’s other work.
© Philippe Ruault
© Philippe Ruault
© Philippe Ruault
© Philippe Ruault